As part of the relocation of gas treatment unit project, the Owner SONATRACH – Regional Direction of Gassi Touil has decided to carry out a feasibility study to confirm the possibility to relocate the existing gas treatment unit of capacity of 4 MMSM3/J from Djebel Bissa (Hassi R’mel) to Gassi Touil.
This project consists of the execution of the feasibility study for gas treatment unit reinstallation.
-
Execution date: 2022
-
Client: SOMIZ spa/ Sonatrach
-
Location: Gassi Touil, Wilaya of Ouargla
-
JALG Scope: Feasibility Study
