preloader

Gathering and Export Pipeline_SWGF (LOT1&3)

The project consists of the construction of:
– A gathering network to connect and exploit twenty-four (24) gas wells located in Hassi BaHamou and Reg Mouaded (HBH&RM) Fields, eleven (11) wells in Hassi Tidjerane (HTJ) Field and sixteen (16) wells in Tinerkouk (TNK) Fields to respectively HBH&RM, HTJ and TNK new plants (CPFs).
– The export pipelines systems for the transportation of treated gas from CPFs to the corresponding tie in points.
The connection of these new wells (in total 51 wells) allows a production of around 11.55 MMScmd of raw gas towards the new HBH&RM, HTJ and TNK plants, the treated gas is exported to SH existing pipeline GR7 via the export pipelines systems.

  • Execution date: June 2019 to July 2020
  • Client: Sonatrach DC EPM
  • Location: Adrar, El Bayadh and Bechar.
  • JALG Scope: Engineering & Procurement Services
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare