preloader

Feasibility Study for The Installation and Start-up of Oil Treatment Unit at TOUAT Phase 2

To Conduct a Feasibility Study for the use of equipments collected from other CTHs in Touat Facility based on ADRAR Refinery requirements.

  • Execution date: 2022
  • Client: ENGTP
  • Location: Dcheiria, Wilaya of Adrar
  • JALG Scope: Feasibility Study
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare