Gathering and Export Pipeline TINHERT to ALRAR, First Gas Phase-EPC4

The project consists of the realization of:
• Surface installations of twenty (20) gas wells.
• Seven (7) manifolds.
• One (01) inlet manifold at the existing CPF gas in ALRAR
• A gathering network consisting of flowlines and trunklines with a total length of 175 Km approximately.

  • Execution date: 2019-2021
  • Client: COSIDER CANALISATION
  • Location: TINHERT, ALRAR Region, Wilaya of Illizi
  • JALG Scope: Engineering & Procurement Services