The project consists of the construction of:
– A gathering network to connect and exploit twenty-four (24) gas wells located in Hassi BaHamou and Reg Mouaded (HBH&RM) Fields, eleven (11) wells in Hassi Tidjerane (HTJ) Field and sixteen (16) wells in Tinerkouk (TNK) Fields to respectively HBH&RM, HTJ and TNK new plants (CPFs).
– The export pipelines systems for the transportation of treated gas from CPFs to the corresponding tie in points.
The connection of these new wells (in total 51 wells) allows a production of around 11.55 MMScmd of raw gas towards the new HBH&RM, HTJ and TNK plants, the treated gas is exported to SH existing pipeline GR7 via the export pipelines systems.
-
Execution date: June 2019 to July 2020
-
Client: Sonatrach DC EPM
-
Location: Adrar, El Bayadh and Bechar.
-
JALG Scope: Engineering & Procurement Services