preloader

Leakage Deviation, Stress Calculation & Anchor Bloc Design

The project consists of an integrity study for a temporary pipeline deviation (OH-1) at the inlet of MEDERBA oil storage & export station.

  • Execution date: 2020
  • Client: ENGTP
  • Location: Mederba, Wilaya of Illizi
  • JALG Scope: Engineering Services (Stress Calculation)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare