South West Gas Field Project

Conceptual Study followed by EPC ITT preparation for the South West Gas Field Development project (Hassi Bahamou, Hassi Tidjrane and Tinerkouk Fields). The project includes three (03) CPFs with slug catchers, booster compressors, gas dehydration with TEG, dew point control and utilities as well as gathering and export networks with a total sales gas production of 12 MMSCMD. (Customer: Sonatrach ENC).

Project Objectives:

  • modularization concept as construction approach
  • Easy Redeployment of Process Modules to other site
  • Maximize standardization across fields
  • Minimize CAPEX and OPEX